Vertical Forms: de-installation, conservation, exhibition and reinstallation

Project: Other

Project Details

Description

Phase 1 – Allowable Costs
• the de-installation of the Artwork from its current site at the Main Building,
University of Hertfordshire College Lane campus;
• any required structural engineering or remedial work required to the
University’s Main Building as a result of the de-installation work;
• the transport of the Artwork to the conservation workshop;
• the conservation work to the Artwork in advance of the exhibition; and
• insurance in respect of all activities associated with Phase 1 of the Project. This includes transportation of the Artwork to Mtec and whilst on
location at Mtec. (The Artwork will be covered by Government Indemnity
during the exhibition but afterwards, University of Hertfordshire must
provide adequate insurance cover.)
• Phase 1 should be completed by 31 March, 2019.
Phase 2 – Allowable Costs
• the re-installation of the Artwork in a suitable location on the University’s
College Lane Campus (to be decided by the University in consultation
with the PMSA and Dr Sophie Bowness.
• Phase 2 should be completed as soon as practicable but by the very
latest December 31, 2022.
StatusFinished
Effective start/end date1/05/1931/03/22