Improving the results of the Earned Value Management technique using artificial neural networks in construction projects

  • Amirhossein Balali
  • , Alireza Valipour
  • , Jurgita Antucheviciene
  • , Jonas Šaparauskas

Research output: Contribution to journal › Article › peer-review

29 Citations (Scopus)

Abstract

The cost, time and scope of a construction project are key parameters for its success. Thus, predicting these indices is indispensable. Correct and accurate prediction of cost throughout the progress of a project gives project managers the chance to identify projects that need revision in their schedules in order to result in the maximum benefit. The aim of this study is to minimize the shortcomings of the Earned Value Management (EVM) method using an Artificial Neural Network (ANN) and multiple regression analysis in order to predict project cost indices more precisely. A total of 50 road construction projects in Fars Province, Iran, were selected for analysis in this research. An ANN model was used to predict the projects' cost performance indices, thereby creating a more accurate symmetry between the predicted and actual cost by considering factors that influence project success. The input data of the ANN model were analysed in MATLAB software. A multiple regression model was also used as another analytical tool to validate the outcome of the ANN. The results showed that the ANN model resulted in a lower Mean Squared Error (MSE) and a greater correlation coefficient than both the traditional EVM model and the multiple regression model.

Original languageEnglish
Article number1745
Pages (from-to)1-17
Number of pages17
JournalSymmetry
Volume12
Issue number10
DOIs
Publication statusPublished - Oct 2020
Externally publishedYes

Keywords

  • Artificial neural networks (ANNs)
  • Earned value management (EVM)
  • Multiple regression analysis
  • Road industry
  • Symmetry

Fingerprint

Dive into the research topics of 'Improving the results of the Earned Value Management technique using artificial neural networks in construction projects'. Together they form a unique fingerprint.

Cite this